ESTINEERSmall shop-built tanks · up to 20 m³Connecting
10 m³ milk tank
Example inputs · engine loading
View only. The PDF report (estimate, drawing and calculations) is in the paid version.
Other formats (Excel, Word, DXF, 3D STEP) are available as paid extras.
ESTINEER FREE - NOT FOR COMMERCIAL USEESTINEER FREE - NOT FOR COMMERCIAL USEESTINEER FREE - NOT FOR COMMERCIAL USE
Drag to rotate · scroll or pinch to zoom · right-drag to pan. Grey: shell and heads · blue: nozzles · orange: supports · red: lifting lugs.
Direct cost
—
material + labour
Indicative price
—
with margin
Man-hours
—
eng · shop · test
Duration
—
from order
Starting the engineering engineThe engineering engine on the Estineer server is working out your tank.
Mark
Service
NPS
Location
Type
Rating
Angle °
Elev / radius mm
Proj. mm
Grey numbers are the engine's automatic values; type a number to fix it. Angle is clockwise from north in plan. Position is the elevation above the shell bottom for shell nozzles, the distance from the centre for roof nozzles, and the distance from the left tangent line for horizontal tanks. Projection is from the shell or head outside to the flange face. Tags starting with M are manways.
Plan
Front elevation
All drawings on A4: general arrangement (third-angle projection) and shop drawings (shell development, cutting list, weld details, notes, weld and nozzle schedules). "Drawings only (PDF)" saves every page; the full PDF report includes them too.
Software output only: must be checked and approved by a qualified engineer. Not engineering advice and not an estimate or quotation.Generated with ESTINEER · www.estineer.com